Azerbaijan's energy minister pressed two Chinese groups in Qingdao on 160 MW of solar, 200 MW of Caspian wind and HVDC cable production.
Shell's US Gulf, Uzbekistan, Nakhchivan: every move Nobel Energy made in 2026 was an engineering or services contract. The upstream stake barely changed. That is the strategy.
Azerbaijan, Georgia, Romania and Hungary target a 2029 investment decision and 2032 first power for the Caspian-Black Sea-Europe cable.
Azerbaijan produced 447,000 bpd in October, 104,000 below its OPEC+ allowance, with the IEA putting spare capacity at only 10,000 bpd.
Enerso, Nobel Energy's renewables arm, has signed investment, power-purchase and grid agreements for the 25 MW 'Qerbi Ufuq' solar plant in Nakhchivan.
Nobel Energy has signed a memorandum with Uzbekneftegaz's UNG Overseas to explore a joint venture in oil and gas, power and water infrastructure.
Audubon Companies, the engineering arm of Azerbaijan's Nobel Energy, has won a Shell contract covering the supermajor's US Gulf deepwater assets.
AzerTelecom and Kazakhtelecom's 380-km Trans-Caspian fibre-optic cable enters its final build phase, with Q3 2026 commissioning to deliver 400 Tbps.
Subscribe and discover the Latest News. Cancel Anytime.